project highlights PROGRAM METRICS

 

Leinenkugel Brewhouse

Chippewa Falls, WI

 

Jake Leinenkugel wanted to create a state-of-the-art brewing facility that looked as if it was built with the original buildings. “I want to respect and strengthen Leiny’s history.” Connolly Architects created a building that exposed the brewing process through three story vertical window patterns. Old world stone work that complemented the 1880’s bottling house was detailed. A safe starting point for the brewery tour including elevator and “grand” stairwell was also designed. The entire building was stacked on a very small area of land surrounded on three sides with other buildings. Jake has doubled his brewing capacity and visitors don’t even notice the new building!

 

 

Area
Description
Qty
S.F.
Tour gathering On main level 1 800
Brewhouse Brew kettles, piping 4 story 1200
Offices Access to exterior offices 2 200
Vertical circulation Elevator and stair - 200
Site   - 1400